Top

North America Water Infrastructure Basket (R) 2017(24) Reference Basket

Master Data

Name: North America Water Infrastructure Basket (R) 2017(24)Initial Fixing Period: 01 September - 31 October 2017
  
Affiliated Bond: A2EH0RFinal Fixing Date: 3 Business Days before 15 December 2024
  

Description of the Components

The basket components are water infrastructure projects in North America with each basket component divided into equity investments (debt or equity) in one or more reference projects (the "Equity Investments"). The selection of equity investments in reference projects within a basket component and the weighting of the basket components in the reference basket is carried out by Signina Capital AG, Switzerland ("Signina"). The weighting of each basket component corresponds at least to the minimum weighting and at most to the maximum weighting. The final composition of the reference basket depends on the availability of equity investments in reference projects and is determined during the Initial Fixing Period.

Basket ComponentsEquity Investments in Reference ProjectsMinimum WeightingMaximum Weighting
    
 Canada Waste to Water/ Canadian Water Purification1. Lakepoint Village, Lake Simcoe; 2. Cramahe Industrial Park; 3. White Tail Ridge; 4. Carp Airport; 5. Fetherston Park; 6. Farsight Homes; 7. Everett; 8. Hillsdale; 9. Colgan; 10.Egmondville 15% 65%
    
 US Hydro/ US- Hydropower Marseilles Lock and Dam 20% 55%
    
 US Waste to Water/ US-Water Purification Mount Holly 15% 65%
    

Weighting of the basket components and the reference projects contained therein at the last investment date

Basket ComponentsEquity Investments in Reference ProjectsWeighting
   
  Canada Waste to Water/ Canadian Water Purification1. Wardsville; 2. Loon Lake Resort; 3. Lakepoint Village, Lake Simcoe; 4. Cramahe Industrial Park; 5. White Tail Ridge; 6. Fetherston Park; 7. Carp Airport; 8. Everett; 9. Hillsdale; 10. Oung Cove 55.33%
   
  US Hydro/ US- Hydropower  Marseilles Lock and Dam 23.87%
   
  US Waste to Water/ US-Water Purification  Mount Holly 20.80%
   

Payments from equity interests in the reference projects less any costs of holding, selling or liquidating the equity interests

Basket ComponentsEquity Investments in Reference ProjectsDateAmount%
     
Canada Waste to Water/
Canadian Water Purification
Water Purification in Ontario30 Nov 2017EUR 41.6320.51%
     
US Hydro/
US- Hydropower
Marseilles Lock and Dam22 Dec 2017EUR 75.8870.92%
     
US Waste to Water/
US-Water Purification
Mount Holly22 Dec 2017EUR 49.8560.98%
     
Canada Waste to Water/
Canadian Water Purification
Water Purification in Ontario05 Jun 2018EUR 141.9311.73%
     
Canada Waste to Water/
Canadian Water Purification
Water Purification in Ontario27 Nov 2018EUR 207.5642.52%
     
US Waste to Water/
US-Water Purification
Mount Holly21 Nov 2018EUR 42.5400.52%
     
Canada Waste to Water/
Canadian Water Purification
Water Purification in Ontario27 Nov 2018USD 2.9800.04%
     
US Waste to Water/
US-Water Purification
Mount Holly02 May 2019EUR 74.3000.90%
     
Canada Waste to Water/
Canadian Water Purification
Water Purification in Ontario04 Jun 2019EUR 178.9212.18%
     
US Waste to Water/
US-Water Purification
Mount Holly15 Nov 2019EUR 43.1770.53%
     
Canada Waste to Water/
Canadian Water Purification
Water Purification in Ontario05 Dec 2019EUR 207.6932.53%
     
US Waste to Water/ US-Water PurificationMount Holly22 May 2020USD 47.6330.53%
     
Current status of the calculated cash reserve account331.611,57 €   

Documents und Downloads